Ostermayer Laboratory Transformation - March 2020 - August 2021. The construction crew prepares the entryway. Credit: Multivista Expand Ostermayer Laboratory main entrance. Credit: Penn State Expand Room 102 at the start of the renovation project. Credit: Multivista Expand Renovated Room 102 Credit: Penn State Expand The renovation project included an extension of the building's interior space, to allow for student gathering areas and an overlook from the third floor to the first floor. Credit: Multivista Expand Student area and overlook Credit: Penn State Expand The rear entrance from the Green Lot. Credit: Multivista Expand Updated Green Lot entryway. Credit: Penn State Expand Building extension and overlook construction Credit: Multivista Expand Third floor collaborative work space Credit: Penn State Expand The design build team considered a variety of colors for interior walls Credit: Multivista Expand Penn State Brand Color - Bright Keystone accents the lab wall Credit: Penn State Expand Chemistry Lab near completion Credit: Multivista Expand The building's natural lighting drives down energy consumption cost Credit: Penn State Expand